Kilimanjaro · 5,895 m
Machame Route
Scenic, varied and Kilimanjaro’s favourite — the Whiskey Route.
- Duration
- 6–7 days
- Summit success
- ~85%
- Difficulty
- Scenery
- Crowds
- Busy
- Sleeps in
- Mountain tents
Tailor-made safaris · Tanzania · Kenya · Uganda
Licensed mountain guides, fair-wage crews and routes chosen for your best chance of success.

Kilimanjaro rises from farmland and rainforest through heath and moorland, alpine desert and finally the arctic summit zone of Uhuru Peak. No technical climbing is required — but altitude demands respect.
That is why we recommend longer itineraries with “climb high, sleep low” profiles, brief every climber daily and pay every guide, porter and cook a fair wage.
Machame, Lemosho, Marangu, Rongai, the Northern Circuit and Umbwe — duration, difficulty, scenery and indicative summit success, side by side.
Kilimanjaro · 5,895 m
Scenic, varied and Kilimanjaro’s favourite — the Whiskey Route.
Kilimanjaro · 5,895 m
Wilderness, panoramas and one of the highest success rates.
Kilimanjaro · 5,895 m
Mountain huts, steady gradients and a classic summit.
Kilimanjaro · 5,895 m
Quiet, dry northern slopes beneath Mawenzi.
Kilimanjaro · 5,895 m
Nine days, 360° views and the best acclimatisation.
Mount Meru · 4,566 m
Wildlife, a dramatic crater rim and sunrise over Kilimanjaro.
| Route | Days | Success | Difficulty | Scenery | Crowds | From |
|---|---|---|---|---|---|---|
| Machame Route | 6–7 days | ~85% | Busy | $ | ||
| Lemosho Route | 7–8 days | ~90% | Quiet first days | $ | ||
| Marangu Route | 5–6 days | ~65% | Busy | $ | ||
| Rongai Route | 6–7 days | ~85% | Quiet | $ | ||
| Northern Circuit | 8–9 days | ~95% | Very quiet | $ | ||
| Mount Meru Climb | 3–4 days | — | Quiet | $ |
Summit success figures are indicative industry estimates and rise with longer itineraries.
Join a scheduled group climb with live availability, or ask for private dates.
New group departure dates are being scheduled. Ask us about the next available dates — or climb privately on any day of the year.
Ask for datesEvery climb is privately guided, with park fees, rescue fees and a full mountain crew included.
6–7 days
Scenic, varied and Kilimanjaro’s favourite — the Whiskey Route.
7–8 days
Wilderness, panoramas and one of the highest success rates.
5–6 days
Mountain huts, steady gradients and a classic summit.
6–7 days
View Rongai Route
8–9 days
Nine days, 360° views and the best acclimatisation.
3–4 days
Wildlife, a dramatic crater rim and sunrise over Kilimanjaro.
1 day
View Kilimanjaro Day Trip — Marangu
1 day
View Lemosho–Londorosi Day Trip
For most travellers we recommend the 8-day Lemosho or 7-day Machame routes: they combine beautiful scenery with good “climb high, sleep low” acclimatisation. Marangu offers huts instead of tents, Rongai is drier and quieter, and the Northern Circuit offers the most acclimatisation and solitude. Compare all routes on our Kilimanjaro page.
No technical climbing is required, but you should be comfortable hiking 5–7 hours a day for several consecutive days. Regular walking, hiking with a daypack and cardio training in the months before your climb make a big difference. Altitude, not fitness, is the main challenge — which is why longer itineraries have higher success rates.
All mountain transfers, Kilimanjaro National Park fees, conservation, camping or hut fees, rescue fees, permits, licensed mountain guides, porters, cooks, fair crew salaries, mountain accommodation, all meals on the trek, government taxes and a pre-trek briefing. Flights, hotels before and after the climb, personal gear, insurance, visa fees and crew tips are excluded.
Every climb is priced on request, because the cost depends on route, duration, group size and season. Share your preferred route and dates and our mountain team will send an itemised quote that includes park fees, rescue fees and a full crew.
The driest months — January to mid-March and June to October — are best. April, May and November are wetter; the northern Rongai route is a good option in rainier periods.
Tips are customary and an important part of crew income. We share clear tipping guidelines per crew member at your pre-trek briefing so you can tip fairly and confidently.
A Yellow Fever certificate is required if you arrive from, or transit through, a country with risk of yellow fever transmission. Consult a travel clinic 6–8 weeks before departure about routine and recommended vaccinations for your itinerary.
Malaria is present in much of Tanzania, including Zanzibar and the safari parks (less so at high altitude). Speak to your doctor about prophylaxis and use repellent, long sleeves at dusk and mosquito nets.
Mild symptoms such as headache are common above 3,000 m. Our guides monitor every climber daily, follow “pole pole” (slowly, slowly) pacing and carry first-aid supplies; any climber showing serious symptoms descends immediately. Longer routes greatly reduce the risk.
Drink bottled or treated water. Mineral water is provided on safari and treated water on the mountain.
No questions match — ask our guides directly.